Have any question?
MALMO STEELS Scaffolding has a rental division, which has set aside certain amount of finished goods (Scaffolding equipment) for renting out to various customers in India. Currently our rental stock includes M-Stage access scaffolding, M-Lock access scaffolding and M-Ring access scaffolding
The General Purpose wall support system combining high performance with simple, rapid assembly. Great versatility and major cost advantages.
The steel soldier system provides maximum benefits when used with heavy duty ties and steel walings or aluminium beams.
Designed to be used in conjunction with standard soldiers, they simplify the construction of corners. By allowing ties to pass through in both direction, each corner soldier replace two standard soldiers. They permit the tie to be closer to the corner which in turn reduce the loading on external corner.
The required length of waling can obtained by joining
the waling together using two M16x35mm bolts & nuts
through the holes in end plates.
Waling of different length (1.2m, 2.7m, 3.6m etc.) are
available.
Depth 'A" are available in 100mm, 125mm, 150mm.
It is used to fasten the steel waling to the face of
the soldier at any height using one M16x75mm
bolt and nut.
It is used to support the shutter from the inside face
of the wall corner. It consist of an right angle bend
sheet two square tube & required number of
thread rod & wing nut. While assembling the
plywood of the shutter is placed between the bend
sheet & square tube as shown in the fig..
The shoring bracket is placed through the soldier and bolted with wing nut along with the tie plate, in addition to this another M16x75 bolt & nut is used to fix the bracket across the soldier. To the shoring soldier left & right shoring adaptor is fastened using 8 nos. of M16x35 bolts & nuts one end of this is fitted to shoring bracket using an M10x75 bolt & nut and the other to the adaptor base using an M10x75
bolt & nut.